Profit Analysis of A Two Unit Cold Standby System with Preventive Maintenance and Random Change in Units
Abstract
This study discusses the reliability of two units cold standby system with single repair. For achieving high reliability of the system, the operative and the standby units are interchanged at random epochs and additional preventive maintenance of operative and the standby units also. After the repair, the unit is sent for inspection to decide whether the repair is satisfactory. In case the repair is found unsatisfactory the unit is again sent for post repair. Using a regenerative point technique, various measures of system effectiveness are obtained.
DOI: https://doi.org/10.3844/jmssp.2005.71.77
Copyright: © 2005 Khaled M. EL-Said and Mohamed S. EL-Sherbeny. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
- 3,182 Views
- 2,393 Downloads
- 19 Citations
Download
Keywords
- Reliability
- Random Change in Units
- Preventive Maintenance
- Post Repair
- Inspection
- Regenerative Point Technique
- Regenerative Pont Technique