TY - JOUR AU - Zucca, Marco AU - Longarini, Nicola AU - de Socio, Federico AU - Migliori, Iacopo PY - 2018 TI - Construction Stage Analysis for a New Mixed Structure Building in Milan JF - International Journal of Structural Glass and Advanced Materials Research VL - 2 IS - 1 DO - 10.3844/sgamrsp.2018.66.72 UR - https://thescipub.com/abstract/sgamrsp.2018.66.72 AB - In this study the Construction Stage Analysis (CSA) of a new mixed structure building is discussed in order to identify the best timing and execution activities scheduling. The building is part of a new university campus that will be realized close to the center of the city. The CSA is carried out by the implementation of two models: the finite element model for the structural analyses and the BIM model for controlling the sequence of the construction phases. Once fixed the structural model, in the preliminary design phase, different sequences are analyzed in order to optimize the construction management in terms of timing and costs. Moreover, the optimization of the construction phases is set by considering the creep and shrinkage of the concrete material.