TY - JOUR AU - Omar, Mohamed K. AU - Suppiah, Yasothei A.P. AU - Teo, Siew C. PY - 2005 TI - Development of Integrated Production Scheduling System in the Process Industry JF - Journal of Computer Science VL - 1 IS - 3 DO - 10.3844/jcssp.2005.395.399 UR - https://thescipub.com/abstract/jcssp.2005.395.399 AB - This study introduces a three-level hierarchical production planning and scheduling approach developed and implemented in a resin factory. Our approach proposes at the first level a mixed-integer linear programming for solving the aggregate planning model. At the second level, a weighted-integer goal-programming model is developed to disaggregate the developed aggregate plans. A sequencing algorithm is developed for the third level that tends to minimize the total weighted tardiness. Real industrial data is used to test and validate the proposed models.